Task Dependencies Guide

Task dependencies are like dominoes - one task must complete successfully before the next one can start. This guide explains how to create powerful workflows using task dependencies.

🔑 Critical Dependency Rules

The #1 Rule: Dependency Scope

Tasks can ONLY depend on other tasks within the SAME task group

This is a fundamental architectural constraint: - ✅ Tasks can depend on other tasks in the same task group - ✅ Task groups can depend on other task groups - ❌ Tasks CANNOT depend on tasks in different groups - ❌ Tasks CANNOT depend on standalone tasks - ❌ Task groups CANNOT depend on individual tasks

Mutual Exclusivity Principle

IMPORTANT: Dependencies are ONLY available for task group tasks, NOT for single tasks:

  • Single Tasks: Cannot have dependencies, use time-based scheduling instead
  • Task Group Tasks: Can have dependencies, inherit scheduling from group

Validation Rules

The system enforces these rules strictly:

  1. Task Dependency Validation:
  2. ✅ Task must have task_group field
  3. ✅ Referenced task must exist in system
  4. ✅ Referenced task must be in SAME task_group
  5. ✅ No circular dependencies within group
  6. ❌ Cannot reference tasks from other groups
  7. ❌ Cannot reference standalone tasks

  8. Task Group Dependency Validation:

  9. ✅ Referenced group must exist in system
  10. ✅ No circular group dependencies
  11. ❌ Cannot reference individual tasks
  12. ❌ Cannot reference non-existent groups

  13. Standalone Task Rules:

  14. ✅ Can have independent schedules
  15. ❌ Cannot have dependency field at all
  16. ❌ Cannot be referenced by other tasks

What Are Task Dependencies?

Think of dependencies like a recipe:

  1. First: Preheat the oven (Task A)

  2. Then: Mix the ingredients (Task B) - can only start after oven is ready

  3. Finally: Bake the cake (Task C) - can only start after ingredients are mixed

In EasyTask, you can create similar chains where Task B waits for Task A to finish successfully before starting.

Why Use Dependencies?

Real-World Examples

Data Processing Pipeline

A classic sequence where each step relies on the output of the previous one.

graph LR
    A[Extract Data] --> B[Clean & Transform]
    B --> C[Generate Reports]
    C --> D[Email Reports]

    style A fill:#f9f,stroke:#333,stroke-width:2px
    style D fill:#bbf,stroke:#333,stroke-width:2px

Backup Workflow

A critical maintenance chain ensuring data safety before bringing systems back online.

graph LR
    A[Stop App] --> B[Backup DB]
    B --> C[Compress]
    C --> D[Upload to Cloud]
    D --> E[Restart App]

    style A fill:#f96,stroke:#333,stroke-width:2px
    style E fill:#9f9,stroke:#333,stroke-width:2px

Understanding the Dependency System

The "Prerequisite" Concept

Think of dependencies as rules of order. Just like you can't put on shoes before your socks, some tasks essentially wait for others.

  • The Prerequisite (Parent): The task that must happen first.
  • The Dependent (Child): The task that waits.

Dependency Types Visualized

1. Simple Chain

The "Domino Effect". Task B waits for A. Task C waits for B.

graph LR
    A[Task A] --> B[Task B]
    B --> C[Task C]

2. Fan-Out (One triggers many)

A single event kicks off multiple parallel processes. For example, "Daily Data Arrives" triggers "Update Sales", "Update Inventory", and "Update HR".

graph LR
    A[Daily Data Loaded] --> B[Update Sales]
    A --> C[Update Inventory]
    A --> D[Update HR]

3. Fan-In (Many trigger one)

A "bottleneck" where a task waits for several others to all finish. "Send Summary Email" runs only after all departmental reports are ready.

graph TD
    A[Sales Report] --> D[Send Summary]
    B[Inventory Report] --> D
    C[HR Report] --> D

4. Complex Graph

Real workflows often mix these patterns together.

graph TD
    Start[Start] --> A[Parallel A]
    Start --> B[Parallel B]
    A --> C[Process C]
    B --> C
    C --> End[Finalize]

Dependency Syntax and Examples

Dependency Format

Dependencies use a simple expression format:

(STATE:TASK_NAME) [operator] (STATE:TASK_NAME)

Available Task States

Code State Badge Color Description
I IDLE 🟨 Yellow Task is waiting to run
A ACTIVE 🟩 Green Task is active/queued
Z TRIGGER 🟦 Blue Task is being triggered
D STARTED 🟦 Cyan Task has started execution
R RUNNING 🟦 Blue Task is currently running
F FAILED 🟥 Red Task execution failed
S SUCCESS 🟩 Green Task completed successfully
T TERMINATED ⬛ Black Task was manually terminated
E REJECTED ⬛ Gray Task was rejected
G RESTARTING 🟠 Orange Task is restarting
O FREEZE 🧊 Light Blue Task is frozen
U UNFREEZE 💧 Light Blue Task is unfrozen

Logical Operators

  • and: Both conditions must be true
  • or: At least one condition must be true
  • not: Invert the condition
  • (): Grouping for precedence

Dependency Examples

// Simple dependency - wait for success
"dependency": "(S:extract_data)"

// Wait for multiple tasks to succeed
"dependency": "(S:task1) and (S:task2)"

// Wait for either task to succeed
"dependency": "(S:task1) or (S:task2)"

// Complex logic
"dependency": "(S:task1) and ((S:task2) or (S:task3))"

// Wait for failure
"dependency": "(F:error_task)"

// Mixed conditions
"dependency": "(S:extract) and not (F:validate)"

Setting Up Dependencies

Method 1: Simple Chain

graph LR
    A[Stop Application] --> B[Create DB Backup]
    B --> C[Compress Backup]
    C --> D[Upload to Cloud]
    D --> E[Restart Application]

Step 1: Create a Task Group

{
  "gid": 3000001,
  "name": "backup-workflow",
  "description": "Complete backup process",
  "day_of_week": "1111111",
  "trigger_times": "02:00",
  "timezone": "UTC",
  "active": true
}

Step 2: Create Tasks in Order

Task 1 - No dependency (first in chain):

{
  "tid": 200001,
  "name": "stop-application",
  "task_owner": "ops_team",
  "task_group": "backup-workflow",
  "description": "Stop the application gracefully",
  "cmd": "systemctl stop myapp",
  "run_on_host": "app-server",
  "run_as_user": "app_user",
  "stdout": "/logs/stop_app.out",
  "stderr": "/logs/stop_app.err",
  "max_run_time": 60,
  "active": true
}

Task 2 - Depends on Task 1:

{
  "tid": 200002,
  "name": "backup-database",
  "task_owner": "ops_team",
  "task_group": "backup-workflow",
  "description": "Create database backup",
  "cmd": "pg_dump -U admin mydb > /backups/backup_$(date +%Y%m%d).sql",
  "run_on_host": "app-server",
  "run_as_user": "db_user",
  "dependency": "(S:stop-application)",
  "stdout": "/logs/backup.out",
  "stderr": "/logs/backup.err",
  "max_run_time": 1800,
  "active": true
}

Task 3 - Depends on Task 2:

{
  "tid": 200003,
  "name": "compress-backup",
  "task_owner": "ops_team",
  "task_group": "backup-workflow",
  "description": "Compress the backup file",
  "cmd": "gzip /backups/backup_$(date +%Y%m%d).sql",
  "run_on_host": "app-server",
  "run_as_user": "backup_user",
  "dependency": "(S:backup-database)",
  "stdout": "/logs/compress.out",
  "stderr": "/logs/compress.err",
  "max_run_time": 300,
  "active": true
}

Task 4 - Depends on Task 3:

{
  "tid": 200004,
  "name": "restart-application",
  "task_owner": "ops_team",
  "task_group": "backup-workflow",
  "description": "Restart the application",
  "cmd": "systemctl start myapp",
  "run_on_host": "app-server",
  "run_as_user": "app_user",
  "dependency": "(S:compress-backup)",
  "stdout": "/logs/restart.out",
  "stderr": "/logs/restart.err",
  "max_run_time": 120,
  "active": true
}

Result: Tasks run in order: stop-application → backup-database → compress-backup → restart-application

Method 2: Fan-Out - Multiple Downstream Tasks

All downstream tasks are triggered as soon as 'stop-application' task completes:

{
  "name": "backup-database",
  "dependency": "(S:stop-application)"
}
{
  "name": "backup-config-files",
  "dependency": "(S:stop-application)"
}
{
  "name": "backup-logs",
  "dependency": "(S:stop-application)"
}

Method 3: Fan-In - Wait for All Upstream Tasks

A task waits until all upstream tasks are completed:

{
  "name": "restart-application",
  "dependency": "(S:stop-application) and (S:backup-database) and (S:compress-backup)"
}

Method 4: Task Group Dependencies

Task groups can depend on other task groups:

{
  "gid": 3000002,
  "name": "data-processing",
  "description": "Process data after extraction",
  "day_of_week": "1111111",
  "trigger_times": "10:00",
  "timezone": "UTC",
  "dependency": "(S:data-extraction)",
  "active": true
}

This task group will only start after the "data-extraction" task group completes successfully.


Valid vs Invalid Dependencies

✅ VALID Scenarios

Tasks Within Same Group

// Task Group: "data_pipeline"
{
  "gid": 300001,
  "name": "data_pipeline",
  "trigger_times": "10:00"
}

// Task 1: First task
{
  "tid": 200001,
  "name": "extract_data",
  "task_group": "data_pipeline"
  // No dependency
}

// Task 2: Depends on Task 1 (VALID)
{
  "tid": 200002,
  "name": "transform_data",
  "task_group": "data_pipeline",
  "dependency": "(S:extract_data)"  // ✅ VALID: Same group
}

// Task 3: Depends on Tasks 1 & 2 (VALID)
{
  "tid": 200003,
  "name": "load_data",
  "task_group": "data_pipeline",
  "dependency": "(S:extract_data) and (S:transform_data)"  // ✅ VALID: Same group
}

Task Groups Depending on Other Groups

// Task Group 1
{
  "gid": 300001,
  "name": "data_extraction",
  "dependency": ""
}

// Task Group 2 (depends on Group 1)
{
  "gid": 300002,
  "name": "data_processing",
  "dependency": "(S:data_extraction)"  // ✅ VALID: Group dependency
}

❌ INVALID Scenarios

Cross-Group Task Dependencies

// Task Group A
{
  "gid": 300001,
  "name": "group_a"
}

// Task Group B
{
  "gid": 300002,
  "name": "group_b"
}

// Task in Group A trying to depend on Task in Group B (INVALID)
{
  "tid": 200001,
  "name": "task_in_group_a",
  "task_group": "group_a",
  "dependency": "(S:task_in_group_b)"  // ❌ INVALID: Different groups!
}

Single Task with Dependencies

// Standalone task cannot have dependencies (INVALID)
{
  "tid": 1000001,
  "name": "standalone_task",
  // No task_group field
  "dependency": "(S:other_task)"  // ❌ INVALID: Single task with dependency!
}

Task Group Depending on Individual Task

// Task group trying to depend on individual task (INVALID)
{
  "gid": 300001,
  "name": "my_group",
  "dependency": "(S:some_individual_task)"  // ❌ INVALID: Groups can only depend on groups!
}

Managing Dependencies with the Dependency Builder

EasyTask features a powerful Dependency Builder that makes creating complex workflows intuitive.

Accessing the Builder

  1. Navigate to TasksTask Definitions
  2. Edit an existing task (✏️ icon) or Add a new task
  3. Click the Dependency field to open the Dependency Builder Modal

Modes of Operation

1. Beginner Mode (Template Driven)

Ideal for common patterns:

Pattern Logic Use Case
All selected tasks succeed (S:task1) and (S:task2) Standard sequential workflow
All selected tasks fail (F:task1) and (F:task2) Error handling workflows
Any selected task succeeds (S:task1) or (S:task2) Redundancy workflows
Any selected task fails (F:task1) or (F:task2) Alerting workflows

2. Advanced Mode (Expression Editor)

For complex logic with specific states and nested conditions.

Example Advanced Expression:

(S:extract_data and S:transform_data) or (F:load_data and not S:notify_admin)

Visual Validation

The builder includes live validation for: - Syntax Errors: Invalid brackets or operators - Circular Dependencies: Preventing A → B → A loops - Scope Errors: Ensuring same-group references only - Logic Flaws: Impossible conditions


Best Practices for Dependencies

✅ Do's

Design for Failure: - Include error handling tasks - Set appropriate timeouts - Use retry attempts for critical steps - Plan for rollback scenarios

Keep It Simple: - Start with linear workflows (A→B→C) - Gradually add complexity as needed - Document your workflow logic - Use meaningful task names

Monitor Performance: - Set realistic timeouts for each task - Monitor total workflow duration - Identify slow steps for optimization - Use parallel processing when possible

Test Thoroughly: - Test each task individually first - Test the complete workflow - Test failure scenarios - Verify rollback procedures work

Respect Scope Rules: - Always verify tasks are in the same group - Use task group dependencies for multi-group workflows - Never try to create cross-group task dependencies - Remember that single tasks cannot have dependencies

❌ Don'ts

Avoid Common Pitfalls: - Don't create circular dependencies (A→B→A) - Don't make workflows too deep (more than 10 levels) - Don't ignore error handling - Don't forget to activate all tasks

Scope Violations: - Don't create dependencies across task groups - Don't reference standalone tasks from group tasks - Don't have task groups depend on individual tasks - Don't forget that dependencies only work within the same group

Performance Issues: - Don't create unnecessary serial dependencies - Don't run too many parallel tasks simultaneously - Don't chain quick tasks that could be combined - Don't ignore resource constraints


Error Handling in Workflows

What Happens When a Task Fails?

  1. Immediate stop: Dependent tasks don't run
  2. Error logging: Failure details are recorded
  3. Notifications: Alerts can be configured
  4. Rollback: Manual or automated cleanup may be needed

Configuring Error Handling

Retry Failed Tasks

{
  "name": "critical-backup",
  "cmd": "backup_script.sh",
  "retry_attempts": 5,
  "max_run_time": 3600
}

Continue on Specific Errors

{
  "name": "optional-cleanup",
  "cmd": "cleanup_script.sh",
  "ignore_failure": true
}

Troubleshooting Dependencies

Common Issues

Workflow Stuck: - Check if parent task is still running - Verify parent task completed successfully - Look for circular dependencies - Check system resources

Unexpected Task Order: - Review task group definitions - Verify task dependencies are correct - Confirm all tasks are in the same group - Check explicit dependency configurations

Validation Errors: - Verify all referenced tasks exist - Ensure tasks are in the same task group - Check for circular dependencies - Confirm task group tasks have run_as_user field

Performance Problems: - Identify bottleneck tasks with long runtimes - Look for serial tasks that could run in parallel - Check if system resources are constrained - Consider breaking large tasks into smaller ones


Quick Reference

Task Group Template

{
  "gid": 3000001,
  "name": "my-workflow",
  "description": "Description of the workflow",
  "day_of_week": "1111111",
  "trigger_times": "02:00",
  "timezone": "UTC",
  "active": true
}

Task with Dependencies Template

{
  "tid": 200001,
  "name": "step-1",
  "task_owner": "your-team",
  "task_group": "my-workflow",
  "description": "First step in workflow",
  "cmd": "echo 'Step 1'",
  "run_on_host": "your-server",
  "run_as_user": "username",
  "max_run_time": 300,
  "retry_attempts": 2,
  "stdout": "/logs/task.out",
  "stderr": "/logs/task.err",
  "active": true
}

Dependency Syntax Quick Guide

# Simple success dependency
(S:task_name)

# Multiple tasks must succeed
(S:task1) and (S:task2)

# Either task can succeed
(S:task1) or (S:task2)

# Complex logic
(S:task1) and ((S:task2) or (S:task3))

# Wait for failure
(F:task_name)

# Negation
(S:task1) and not (F:task2)

Frequently Asked Questions

Q: Can a task depend on another task's failure? A: Yes. Use the (F:task_name) syntax in your dependency expression to wait for a task to fail before running. This is useful for sending alerts or running cleanup scripts.

Q: What happens if a dependency is still running when the scheduled time arrives? A: EasyTask waits for all dependency conditions to be met before launching a task. The task will remain in a pending state until its dependencies resolve.

Q: Can I combine AND and OR logic in a single dependency expression? A: Yes. You can write complex expressions like (S:task1) and ((S:task2) or (S:task3)) using parentheses to group conditions. EasyTask supports AND, OR, and NOT operators.

🔗 Next Steps: Learn how to connect your workflows to external services with the Integrations Guide!